Snow Removal

Winter Road Maintenance

Please use caution and defensive driving practices when operating a vehicle under winter conditions. In order to enhance your winter driving safety, please ensure that your vehicle is equipped with good winter tires and/or chains.

There are 140 roads in Peachland totaling 65 km. Each road can take 2 - 4 passes to completely plow. Snow conditions (heavy/wet or light/fluffy) affect plowing and sanding time. Operators strive to get the roads in safe drivable condition as soon as they can. 

The District of Peachland policy, as approved by Council, is to have major arterial roads plowed within 12 hours, secondary collector roads plowed within 36 hours and residential streets plowed within 96 hours.

School bus routes are done first, then the steepest roads and connector roads. Side streets, flat roads and cul-de-sacs are done last, unless they form part of completing a route in the most efficient, cost effective and time-saving way. Equipment breakdowns are unavoidable and unscheduled and do create frustrating delays in plowing and/or sanding.

Snow plowing and sanding may also be delayed by vehicles disabled in deep snow, vehicles parked on the road allowance, severe weather and whiteout conditions, equipment rendered inadequate by the depths of the snow or drifts, refueling the trucks, refilling of sand, installing chains or new blades and unforeseen emergencies.

  • Road boulevards and rights-of-way, during winter conditions, MUST be kept clear of vehicles, boats and RVs.
  • Vehicles found parked or stored on road right of ways in excess of 72 hours or obstructing traffic will be subjected to a ticket and/or towed.
  • Vehicles with expired plates or without licence plates that are parked on District boulevards or road right of ways are considered abandoned and can be towed without notice.

Snow Removal Information